DDU-GKY TRAINING CENTRE AND GIRLS HOSTEL WITH CANTEEN
#ddugky (Deen Dayal Upadhyaya Grameen Kaushalya Yojana) was first introduced by #ModiGovernment in the year 2014. It has streamlined the similar skill development schemes which were in existence earlier, re-structured the whole process and brought about a radical change in empowering the youths of the country with new skills and also provided them the much needed employment both in Government as well as private sectors.
AsthaCorp was approached by Project Implementation Agencies (PIA) of the DDU-GKY to find a suitable building for setting up a training centre and hostel premises for 175 students in Assam. We have constructed 4 state of-the-art classrooms fully equipped with Audio Video facility, computer network based training facility, CCTV monitoring for surveillance, fingerprint based attendance system, one fully equipped IT laboratory with 35 networked computers, two domain laboratories and fully functional office for the staff as well as the training faculty in a record time of just 15 days. The hostel also has a fully functional canteen and on-site pantry for preparing daily food. It is all-in-all a self sufficient centre cum hostel facility.
Our Scope:
1. Searching for suitable building and liaising with the building owner.
2. Architectural planning, layouting, drafting and monitoring of the project.
3. Renovation of civil structure including roof, walls, doors, windows, ventilation, false ceiling, Aluminium partitions with compressed wood boards and glass, flooring and other ancillary facilities.
4. All furniture and fixture including beds, chairs, tables, almirahs storages, canteen furniture, CCTV, biometric attendance system, etc.
5. Entire IT infrastructure including biometric attendance system, network designing and networking.
6. Running the canteen with an in-house team of cooks and attendants.
7. Power back-up in the form of Diesel Generator.
8. All electrical fixtures including AC, fans, lights, switchboards, main DB box, etc.
9. Project Management, Procurement, Inventory Management and Site Logistics.
10. Installation of Lab equipments.
Project Statistics
15 days
Time Required
81
Manpower Deployed
12
Processes Managed